Search Chetwoods

Projects

GLP G-Park TNT Swindon

Facility included an ancillary office accommodation, parking, gatehouse, fuel and wash facilities, landscaping and associated works.
Size
55,000 sqft
Location
Swindon
Status
Complete
Contractor
Designers
Chetwoods Architects
Client
TNT
Photographer

A parcel distribution facility for TNT on the 39.14 hectares G-Park Swindon.

Energy saving features included an energy efficient envelope, LED lighting to offices with 10% natural lighting from roof lights, occupancy detection lighting controls and daylight dimming, electrical sub metering and solar thermal pre-heating of hot water.

Water management features comprised rainwater harvesting, low flush WCs, spray taps with motion detectors, leak detection on incoming mains cold water supply and onsite surface water attenuation measures.

Recycled and recyclable materials were used where possible, including carpet tiles, organic paints, office partitions, ceiling tiles, responsibly sourced timber, recycled floor coverings, recycled aggregates, dock levellers, shelters and doors. Waste was minimised during design and construction.

Share this Project

impact

Project Highlights
  • 55,000 sqft parcel distribution facility
  • Occupancy detection lighting controls and daylight dimming
  • Landscaping and associated works
  • Energy savings through energy efficient envelope
  • Recycled floor coverings, aggregates, dock levellers, shelters and doors
  • Office accommodation, parking, gatehouse, fuel and wash facilities

A comment on the project